Thank you for subscribing to our newsletter.

Bültene üye ol

Please check the errors in the form and fill the required fields with *

close-button
Hero

Case Study – Grand Harbour Marina

A complete renewal of a derelict waterfront in a historical setting

Situated in Malta, long considered a major maritime crossroads, Grand Harbour Marina was one of the Mediterranean’s largest purpose-built superyacht marinas when it opened in 2002. It offers 50 berths for yachts of 25 to 100 metres LOA, 225 pontoon berths and additional moorings for locally owned craft.

Gallery
Added value:
  • A true urban renewal scheme with the transformation of derelict commercial quays into pleasant waterfront promenades
  • Increased berthing tariffs by an average 13% per annum since 2005
  • An uplift to local property values
  • Best utilisation of available water area
  • Luxury facilities developed in and around the marina
  • Berth design centred around providing maximum operational flexibility
  • Proud host marina to the Rolex Middle Sea Race, and Trophée Bailli de Suffren
Capital cost and financial implications:
  • Repair and embellishment of existing quaysides (former naval base)
  • Use of flexible pontoon moorings, otherwise reducing piling cost in deep water
  • Ability to create additional berths, at reduced cost

For a list of our current and recent marina planning, design, consultancy, development projects around the world, click here.

Dalga Boyu Bültenimize Kaydolun

We use cookies to give you the best online experience. By using our website, you agree to our use of cookies in accordance with our cookie policy. Click here to read our cookie policy.