Thank you for subscribing to our newsletter.

Bültene üye ol

Please check the errors in the form and fill the required fields with *

close-button
Hero

Case Study – Port Louis Marina

Transformed a wreck-strewn lagoon into the south Caribbean’s finest marina

Wholly owned and operated by Camper & Nicholsons, Port Louis Marina is situated in a natural lagoon on the lee side of the ‘Spice Island’ of Grenada in the south eastern Caribbean island chain. The marina offers luxury berthing and services for yachts up to 100m LOA.

Gallery
Added value:
  • Transformation of a derelict and wreck-strewn lagoon into a state of the art, high class marina
  • Creation of docks dedicated to accommodating some of the world’s largest super yachts
  • Proud host of many sailing events; destination port for the Royal Ocean Racing Club’s Transatlantic Race
  • Creation of an uplift to surrounding land and property values
Capital cost and financial implications:
  • Phased development, for incremental expenditure
  • Hybrid solution for quays and pontoons, reducing construction costs
  • Flexible mooring system, omitting requirement for expensive and long piles in poor ground bearing conditions

For a list of our current and recent marina planning, design, consultancy, development projects around the world, click here.

case study

Case Study – Sanya Marina

Increased revenue from an improved berth mix

case study

Case Study – Dubai Harbour

Largest maritime and leisure hub in the Middle East designed by Camper & Nicholsons Marinas

case study

Case Study – Grand Harbour Marina

A complete renewal of a derelict waterfront in a historical setting

case study

Case Study – Limassol Marina

Integrated a 520 berth marina with a shoreside commercial zone that redefined the city waterfront

case study

Case Study – Port Louis Marina

Transformed a wreck-strewn lagoon into the south Caribbean’s finest marina

case study

Case Study – Cesme Marina

Winner of 2014 PIANC Marina Excellence Design Jack Nichol Award

case study

Case Study – St Katharine Docks

Flexible berth layout provides a maritime centre for international events based in London

case study

Case Study – Yas Marina

We grew annual occupancy from 13% to 87% in under 3 years and hosted five F1 Grand Prix events

Dalga Boyu Bültenimize Kaydolun